Your cart is empty.
Your cart is empty.
Please Notice:
After confirming the sealing of the cooling water, the motor is started, and the motor steering should be operated with the steering sign of the main shaft, and the reversal is strictly prohibited!
Do not let the machine blank run and reverse!!!
Parameters:
Voltage: 110V
Power: 2.2KW
Speed: 2900r/min
Flow range: 0-3m3/h
N-d: φ4-16mm
Inlet: 38mm
Exit: 32mm
Material: #304 stainless steel
Attention and maintain.
1.Check whether the import and export seal is good, there are no impurities, metal chips and other materials that have damaged equipment into the body.
2.When the power switch is connected, a safe contact motor device should be installed.
3.Before the connection between the import and export process pipe and the process pipe, first, clean the process pipeline, and ensure that the process pipeline without welding slag, metal chips, glass chips, quartz sand and other damaged equipment can be connected with the machine after the hard material.
4.The pipeline must be simple and direct, as far as possible to reduce the components of the elbow pipe, thus reducing the resistance of the material in the circulation process.
5.The choice of location for intermittent equipment installation is suitable for vertical level of containers. When dumping, it must be well sealed, moisture-proof, moisture proof, dust-proof and explosion-proof.
6.Before starting the machine, first, turn the spindle, the hands feel the light and heavy, flexible, no other frictional sound and abnormal sound.
7.When installing the pipeline, the inlet and outlet pipe adopts the clamp live connection structure.
8.After the completion of the above work, the power supply is started, and the steering axis of the motor steering axis is checked and checked repeatedly.
Item included:
One set of 110V 2200W High Shear Emulsifying Pump